Demo of existing space complete. Walls painted. Electrical being installed.

MCEC Student Success Center

Demo existing
Remove floor tiles.
Repair walls and ceiling.
Paint walls
Complete electrical
Install carpet
Install furniture
Walter Shannon
Advanced Mfg Ctr
Carpenter Associates
.
.
.
.
.
.
|

03/10/2025

Consigli
Construction

The new University of Maine College of Engineering and Computing (MCEC) Student Success Center, Industry 4.0, and other AMC renovations are underway and nearing completion. The project includes renovations on the 2nd floor of AMC to construct the MCEC Student Success Center. Industry 4.0 will be located on the 2nd floor within the lab portion of the facility. This summer, a new staircase will be added from the main lobby to the 2nd floor, allowing easier access to the new Student Success Center and Industry 4.0. Funding of $4.5 million, $1 million from HAF/UMS TRANSFORMS MCEC for the construction of the new staircase and Student Success Center, and $3.5 million in FY23 Congressionally Directed Spending secured by U.S. Rep. Golden with the support of U.S. Sens. Collins and King from the Department of Defense Industrial Base Analysis and Sustainment for construction and equipment for Industry 4.0. The design firm for Student Success and Industry 4.0 is Carpenter Associates, the design firm for the monumental staircase is WBRC, and the construction manager for all three is Consigli Construction with support from the UMaine Facilities Shops.

Last Updated:

IMG_2105.HEIC
YES
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
.

Construction Photos and Documents 

UmaineDash11A.jpg
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC

Project Documents

Document 1
Document 2
Document 3

Funding Sources and Documents

Document 1
Document 2
Document 3
Document 4
Campus Project Tracker
bottom of page