top of page
UMaineDash8.jpg
UMaineSmallFood.jpg
|
.
.
.
.
.
.
|
.
.

PFAS and Catalysis Laboratory

Nick Ramsey
Jenness Hall
Lavallee Brensinger
.
.
.
.
.
.
.

Landry French
Design Development

The project is to renovate a portion of the 2nd floor of Jenness Hall for a PFAS laboratory and a Catalysis laboratory. Renovations for the two labs are anticipated to start this summer, with substantial completion in early 2026. The design firm selected for this project is LaVallee Brensinger, and the construction manager is Landry/French Construction. $5 million in Congressionally Directed Spending secured by U.S. Sens. Collins and King at the request of UMS will come from the National Institutes of Standards and Technologies (NIST) for the construction of the PFAS laboratory and $2 million by HAF/UMS TRANSFORMS Maine College of Engineering and Computing (MCEC) for the construction of the Catalysis laboratory.

Last Updated:

IMG_2105.HEIC
YES
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
.

Construction Photos and Documents 

UmaineDash11A.jpg
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC

Project Documents

Document 1
Document 2
Document 3

Funding Sources and Documents

Document 1
Document 2
Document 3
Document 4
Campus Project Tracker
bottom of page