Draft GMP attached. Lateral system to be purchased as soon as contract signed. Mobilization to follow ASAP.

Packaging facility and pesticide upgrades on hold. Drawings basically complete but on hold for possible scope reduction. To be re-evaluated after Irrigation GMP received.

Tentative Grant extension through 1/31/27. Awaiting final documentation. Current budget reflects only the irrigation system. Total grant approval is $2.9M.

Lateral Irrigation System

GMP Due
Contract
Lateral System Purchase
Mobilization
Trenching
Conduit/Piping
Shed/Transformer
Completion
Patrick Decker
207-581-2632
Blueberry Hill
Carpenter Associates
|
.
.
.
.
.
.

06/04/2026

C.E.M.
Construction Drawings
06/05/2026
06/10/2026
06/10/2026
06/10/2026
07/31/2026
08/31/2026
9/30/2026
11/30/2026

Irrigation system scope includes trenching, piping, conduit, transformer vault, shed, well pump, hydrant, and lateral system installations. U.S. Sens. Collins and King secured funding of $3 million in FY23 Congressional Directed Spending at the request of the System.

$1,150,000
01/31/2027

Last Updated:

Dana Underwood

IMG_2105.HEIC
YES
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
.

Construction Photos and Documents 

UmaineDash11A.jpg
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC
IMG_2105.HEIC

Project Documents

Document 2
Document 3

Funding Sources and Documents

Document 1
Document 2
Document 3
Document 4
Campus Project Tracker
bottom of page